Beijing LBY energy storage project

Project Location: Beijing LBY building
Project Capacity: 1.5Mwh
Commission time: March, 2018
Project application: Lead carbon and Lithium battery Hybrid storage project

LBY energy storage project has successfully realized the time-shift function. The system charging and discharging strategy is set according to TOU standard, for example charging at off-peak time and discharging at peak time to realize peak shaving. This project aim to help owner to save electricity bill by time-shift and achieve the benefit; this station support off-grid operation, and supply stable voltage and frequency for the building as main power resource to make sure key load running safety and stability, meanwhile achieve “ No worry for power consumption and No worry for power outage” goal; this energy storage power plant can also eliminate the peak shaving for enterprises and reduce the capacity paid to Grid.