New project at a 100MW wind farm
2025-08-08
010203
This 125kW/261kWh all in one cabinet has arrived at the project site - a 100MW wind farm in Jiangsu. BESS is getting more and more important to renewables, it can:
Enhancing wind power utilization;
Smoothing output fluctuations;
Boosting grid integration of wind farms;
Maximizing on-site renewable use;
Enabling time-shifted power delivery.
DOWELL ESS's technical team is now stay at the site to ensure that all data meet expectations through on-site debugging and EMS monitoring. After this testing , we look forward to the smooth delivery of the next 50 units.





